MOQ: | 1 Set |
Price: | Negotiable |
Standard Packaging: | Standard Exporting Plywood Case |
Delivery Period: | 30 days |
Payment Method: | L/C, T/T |
Supply Capacity: | 10 Sets / Month |
IEC 60884-1 Chapter 19 Temperature Rise Test Plugs
Product information:
The temperature rise plugs confirm to requirements of IEC60884 standard 19 Chapter.
Temperature insulating plugs are designed according to different country's standards.
With brass bolts, having a predetermined minimum size of the plug pins.
Usage:
Please refer to relative standard requirements.
Note: Need to connect with wire at least 1m when processing testing.
Configuration of BS1363 temperature rise plug
MOQ: | 1 Set |
Price: | Negotiable |
Standard Packaging: | Standard Exporting Plywood Case |
Delivery Period: | 30 days |
Payment Method: | L/C, T/T |
Supply Capacity: | 10 Sets / Month |
IEC 60884-1 Chapter 19 Temperature Rise Test Plugs
Product information:
The temperature rise plugs confirm to requirements of IEC60884 standard 19 Chapter.
Temperature insulating plugs are designed according to different country's standards.
With brass bolts, having a predetermined minimum size of the plug pins.
Usage:
Please refer to relative standard requirements.
Note: Need to connect with wire at least 1m when processing testing.
Configuration of BS1363 temperature rise plug