Send Message
products
PRODUCTS DETAILS
Home > Products >
IEC 60745 Electric Hammer Durability Impact Test Equipment For Hand Held Motor

IEC 60745 Electric Hammer Durability Impact Test Equipment For Hand Held Motor

MOQ: 1
Price: Negotiable
Standard Packaging: Standard Exporting Boxed
Delivery Period: 20 Days
Payment Method: L/C, T/T
Supply Capacity: 30 Sets Per Month
Detail Information
Place of Origin
China
Brand Name
Sinuo
Certification
Calibration Certificate (Cost Additional)
Model Number
SN2801
Applied Standard:
IEC 60745-2-1 And IEC 60745-2-6
Applied Clause:
Clause 17 And Figure 103
Air Source:
5~8 Bar
Electrical Control:
PLC And 7 Inch Touch Screen
No-load Rotation Rate:
0-360°/s, Preset
Power Off Time:
0-999.9s, Preset
Steel Ball:
Φ38mm
Rubber Plate:
A Set Of 4
Minimum Order Quantity:
1
Price:
Negotiable
Packaging Details:
Standard Exporting Boxed
Delivery Time:
20 Days
Payment Terms:
L/C, T/T
Supply Ability:
30 Sets Per Month
High Light:

Electric Hammer Impact Test Equipment

,

IEC 60745 Impact Test Equipment

,

PLC Impact Test Equipment

Product Description

 

IEC 60745 Electric Hammer Durability Impact Test Equipment For Hand Held Motor

 

Product Information:

This electrical hammer durability impact test equipment conforms to IEC 60745-2-1 clause 17 and IEC 60745-2-6 clause 17 and figure 103.

This apparatus is applicable to durability test for hand held motor operated

electric tools such as electric hammers, Electric drills and impact drills, which power no more than 2.5KW, to check whether electrical or mechanical hazard appears during the normal use of the electric hammer or drill.

 

Technical Parameters:

No. Item Specifications
1 Power supply 220V/50Hz
2 Air source 5~8 bar
3 Electrical control PLC and 7 Inch Touch screen
4 Load voltage 0-250V adjustable, current display
5 No-load rotation angle 0°,90°,180°, can manual control clockwise or counter clockwise
6 No-load rotation rate 0-360°/s, preset
7 Power on time 0-999.9s, preset
8 Power off time 0-999.9s, preset
9 Test time 0-9999h, preset
10 Total test time 0-9999h, preset
11 Interval time 0-9999min, preset
12 Load pressure 100,125,150,175,200,250,300,350,400N preset
13 Impact head 0.7,1.4,2.3,3.4kg (include the connect handle), use according to table 101
14 Steel ball Φ38mm
15 Steel plate 100,140,180,220mm, use according to table 101
16 Rubber plate A set of 4, Matching with steel plate and steel base
17 Steel base base weight 90kg, equipped with 9 pcs 30kg weights
18 Equipment dimension

Control cabinet 600mm*400mm*750mm, aprox. 100kgs

Test rack 400mm*400mm*2000mm, aprox. 450kgs

 
Equipment Structure
A. Electric control cabinet containing PLC, 7 Inch Touch screen, control panel, load (voltage 0-250V adjustable, voltage and current display);
B. Mechanical device as shown in Figure 103, containing 360 kilograms of steel base, including the impact head, steel plate and fixture.
 

Test Functions:

1. No load test: All hammers, including hammers with drill only mode, are mounted vertically in a test apparatus as shown in Figure 103 and are operated at 1.1 times rated voltage for 12h, then operated at 0.9 times rated voltage for 12h. Each cycle comprising a period of operation of 30s and a rest period of 90s during which the tool remains switched off. During test, on each test voltage, hammer placed in three different directions (horizontal, vertical, vertical), each position of the tool running time of about 4 hours.

2. Load test: All hammers, including hammers with drill only mode, are mounted vertically in a test apparatus as shown in Figure 103 and are operated at rated voltage or at the mean value of the rated voltage range, for four periods of 6h each, the interval between these periods being at least 30 min.

During these tests, hammers are operated intermittently, each cycle comprising a period of operation of 30s and a rest period of 90s during which the tool remains switched off.

During the tests, an axial force to ensure steady operation of the impact mechanism is applied to the hammer through a resilient medium.

If the temperature rise of any part of the tool exceeds the temperature rise determined during the test of 12.1, forced cooling or rest periods are applied, the rest period being excluded from the specified operating time.
IEC 60745 Electric Hammer Durability Impact Test Equipment For Hand Held Motor 0IEC 60745 Electric Hammer Durability Impact Test Equipment For Hand Held Motor 1

 

products
PRODUCTS DETAILS
IEC 60745 Electric Hammer Durability Impact Test Equipment For Hand Held Motor
MOQ: 1
Price: Negotiable
Standard Packaging: Standard Exporting Boxed
Delivery Period: 20 Days
Payment Method: L/C, T/T
Supply Capacity: 30 Sets Per Month
Detail Information
Place of Origin
China
Brand Name
Sinuo
Certification
Calibration Certificate (Cost Additional)
Model Number
SN2801
Applied Standard:
IEC 60745-2-1 And IEC 60745-2-6
Applied Clause:
Clause 17 And Figure 103
Air Source:
5~8 Bar
Electrical Control:
PLC And 7 Inch Touch Screen
No-load Rotation Rate:
0-360°/s, Preset
Power Off Time:
0-999.9s, Preset
Steel Ball:
Φ38mm
Rubber Plate:
A Set Of 4
Minimum Order Quantity:
1
Price:
Negotiable
Packaging Details:
Standard Exporting Boxed
Delivery Time:
20 Days
Payment Terms:
L/C, T/T
Supply Ability:
30 Sets Per Month
High Light

Electric Hammer Impact Test Equipment

,

IEC 60745 Impact Test Equipment

,

PLC Impact Test Equipment

Product Description

 

IEC 60745 Electric Hammer Durability Impact Test Equipment For Hand Held Motor

 

Product Information:

This electrical hammer durability impact test equipment conforms to IEC 60745-2-1 clause 17 and IEC 60745-2-6 clause 17 and figure 103.

This apparatus is applicable to durability test for hand held motor operated

electric tools such as electric hammers, Electric drills and impact drills, which power no more than 2.5KW, to check whether electrical or mechanical hazard appears during the normal use of the electric hammer or drill.

 

Technical Parameters:

No. Item Specifications
1 Power supply 220V/50Hz
2 Air source 5~8 bar
3 Electrical control PLC and 7 Inch Touch screen
4 Load voltage 0-250V adjustable, current display
5 No-load rotation angle 0°,90°,180°, can manual control clockwise or counter clockwise
6 No-load rotation rate 0-360°/s, preset
7 Power on time 0-999.9s, preset
8 Power off time 0-999.9s, preset
9 Test time 0-9999h, preset
10 Total test time 0-9999h, preset
11 Interval time 0-9999min, preset
12 Load pressure 100,125,150,175,200,250,300,350,400N preset
13 Impact head 0.7,1.4,2.3,3.4kg (include the connect handle), use according to table 101
14 Steel ball Φ38mm
15 Steel plate 100,140,180,220mm, use according to table 101
16 Rubber plate A set of 4, Matching with steel plate and steel base
17 Steel base base weight 90kg, equipped with 9 pcs 30kg weights
18 Equipment dimension

Control cabinet 600mm*400mm*750mm, aprox. 100kgs

Test rack 400mm*400mm*2000mm, aprox. 450kgs

 
Equipment Structure
A. Electric control cabinet containing PLC, 7 Inch Touch screen, control panel, load (voltage 0-250V adjustable, voltage and current display);
B. Mechanical device as shown in Figure 103, containing 360 kilograms of steel base, including the impact head, steel plate and fixture.
 

Test Functions:

1. No load test: All hammers, including hammers with drill only mode, are mounted vertically in a test apparatus as shown in Figure 103 and are operated at 1.1 times rated voltage for 12h, then operated at 0.9 times rated voltage for 12h. Each cycle comprising a period of operation of 30s and a rest period of 90s during which the tool remains switched off. During test, on each test voltage, hammer placed in three different directions (horizontal, vertical, vertical), each position of the tool running time of about 4 hours.

2. Load test: All hammers, including hammers with drill only mode, are mounted vertically in a test apparatus as shown in Figure 103 and are operated at rated voltage or at the mean value of the rated voltage range, for four periods of 6h each, the interval between these periods being at least 30 min.

During these tests, hammers are operated intermittently, each cycle comprising a period of operation of 30s and a rest period of 90s during which the tool remains switched off.

During the tests, an axial force to ensure steady operation of the impact mechanism is applied to the hammer through a resilient medium.

If the temperature rise of any part of the tool exceeds the temperature rise determined during the test of 12.1, forced cooling or rest periods are applied, the rest period being excluded from the specified operating time.
IEC 60745 Electric Hammer Durability Impact Test Equipment For Hand Held Motor 0IEC 60745 Electric Hammer Durability Impact Test Equipment For Hand Held Motor 1

 

Sitemap |  Privacy Policy | China Good Quality Electrical Appliance Testing Equipment Supplier. Copyright © 2019-2024 sinuotek.com . All Rights Reserved.