logo
Products
PRODUCTS DETAILS
Home > Products >
ISO 15042 7.5HP Air-Enthalpy Energy Difference Test system

ISO 15042 7.5HP Air-Enthalpy Energy Difference Test system

MOQ: 1
Price: Tailored
Standard Packaging: Plywood
Delivery Period: 2 Months
Payment Method: T/T
Supply Capacity: 1 Set Per Month
Detail Information
Place of Origin
China
Brand Name
Sinuo
Certification
Calibration Certificate (Cost Additional)
Model Number
SN331-25RT
Applied Standards:
ISO 15042, ISO 5151, Etc.
UUT Type:
7.5HP Air Conditioners
Test Report:
Format Can Be Customized
Cooling Capacity:
0.75 HP~7.5 HP
Heating Capacity:
0.75 HP~7.5 HP
Air Flow:
300~4000 M³/h
Static Pressure Precision:
≤±(±0.5%RD)+(±0.5%FS)
Nozzle Pressure Precision:
≤±(±0.25%RD)+(±0.25%FS)
Product Description
ISO 15042 7.5HP Air-Enthalpy Energy Difference Test System
System Overview
This 7.5HP air enthalpy method test laboratory consists of indoor and outdoor side rooms designed to test air conditioner performance by measuring temperature, pressure, and electrical parameters. The system is suitable for testing window type, split type, and free-standing air conditioners, supporting both standard operating condition tests and expanded testing requirements for product sampling inspection and development.
System operation is controlled via programmable controller and HMI interface, with high-accuracy data collection and real-time data transfer to upper-level computers for processing, display, storage, and report generation.
Compliance Standards
Designed and tested according to:
  • ISO 5151:2010
  • ISO 15042:2017
Operating Principle
The test room adjusts air dry bulb and wet bulb temperatures through balanced temperature and humidity control. The refrigeration system provides continuous cooling and dehumidification, while temperature control meters regulate heater and humidifier output to achieve desired air conditions.
ISO 15042 7.5HP Air-Enthalpy Energy Difference Test system 0
Operational Procedures
Pre-Startup Checklist
  • Review previous running records
  • Verify power and water supply status
  • Ensure unit under test (UUT) is properly installed
Standard Operation
  • Close power breaker and press "Start" button
  • Activate fans, heating, humidifying, and static pressure systems via HMI
  • Engage refrigeration and nozzle systems as required
  • Set temperature controller SV values according to operating conditions
  • Energize UUT via frequency variable power supply
  • Measure UUT parameters once operating conditions stabilize
  • Shutdown follows reverse sequence of startup procedure
Unit Under Test Specifications
Supported UUT Types
  • Wall type
  • Ceiling type
  • 4-way type
  • Floor stand type
Measurement Ranges
  • Testing Capacity Range:
    • Cooling Capacity: 0.75 HP - 7.5 HP
    • Heating Capacity: 0.75 HP - 7.5 HP
  • Air Flow: 300-4000 m³/h (7.5HP receiving chamber)
  • Unit Dimensions:
    • Panel Type: W≤1000mm, D≤800mm, H≤1800mm
    • Split Type: W≤1000mm, D≤500mm, H≤2000mm
  • Electrical Parameters:
    • Single phase power: 0-5kW
    • Single phase voltage: 0-300V
    • Single phase current: 0-20A
    • Frequency: 50/60Hz
    • Power factor: 0-1
Power Supply
  • Type: Three Phase, Four Wire, 45kVA (1 set)
  • Supply station: 7.5HP One-driven-one type (3-phase power supply)
Environmental Requirements
  • No strong air flow, direct sunlight, or corrosive gases
  • No intense vibration or interference sources
  • Ambient temperature: 0℃-35℃, relative humidity: <90%
  • Test control room environment:
    • Temperature: 23℃±5℃
    • Humidity: <85%RH (including non-operational periods)
    • Free from insects, rodents, and corrosive gases
Utility Requirements
  • Power supply: 3Φ5W 415V±10%, 50Hz, 150kVA (50%-85% operational rate)
  • Water supply: Clean, scale-free water at 20L/h; DN15 connection
  • Drainage: DN50 connection
Testing Capabilities
  • Rated cooling capacity (T1, T2, T3)
  • Rated heating capacity (High, Low, Extra-low)
  • Airflow measurement
  • Dehumidification capacity
  • Input power analysis
  • EER/COP calculation
  • Frequency, current, and voltage measurement
Measurement Accuracy
Measurement AccuracyRepeatability Accuracy
Compared with standard machineAverage deviation from 3 tests once installed
Cooling capacity: ±2%Cooling capacity: ±1%
Heating capacity: ±2%Heating capacity: ±1%
Major Test Conditions
NoTesting ItemIndoor Side (℃)Outdoor Side (℃)
Dry BulbWet BulbDry BulbWet Bulb
1Rating Cooling T127193524
Rating Cooling T221152719
Rating Cooling T329194624
2Maximum Cooling T132234832
Maximum Cooling T227193524
Maximum Cooling T332235231
3Freeze-up T121152115
Freeze-up T22115108
Freeze-up T321152115
4Minimum Cooling21151812
5Enclosure Sweat27242724
6Rating Heating High201576
Rating Heating Low201521
Rating Heating Extra Low108-5-6
7Maximum Heating27192418
8Minimum Heating2015-7-8
9Automatic Defrost201221
Additional Test Conditions
Indoor SideOutdoor Side
Temperature (℃)10-40-15-60
Relative Humidity (RH)35%-93%25%-93%
Control Precision (℃)±0.2 (WB)±0.2 (WB)
Testing Precision (℃)±0.1 (WB)±0.1 (WB)
Note: Temperature combinations should not significantly deviate from standards. Standard refrigeration/heating conditions maintain ±0.2℃ control precision; other conditions maintain ±0.3℃. Capacity testing available via single side enthalpy method. Performance not guaranteed during defrosting or unit stoppage.
Continuous Operation
Outdoor side room continuous operation capability:
  • ≥10 hours at DB=2.0℃, WB=1.0℃
  • ≥8 hours at DB=-7.0℃, WB=-8.0℃
Measurement Uncertainties
  • RTD temperature precision: ≤±0.1℃
  • Static pressure difference: ≤±(±0.5%RD)+(±0.5%FS)
  • Nozzle pressure difference: ≤±(±0.25%RD)+(±0.25%FS)
  • Inlet & Outlet difference: ≤±(±0.25%RD)+(±0.25%FS)
  • Electrical inputs: ≤±(±0.25%RD)+(±0.25%FS)
  • Thermocouple temperature: ≤±0.5℃
  • Refrigerant pressure: ≤±(±0.25%RD)+(±0.25%FS)
  • Relative humidity transmitter: ≤±3.0%RH
System Structure
ISO 15042 7.5HP Air-Enthalpy Energy Difference Test system 1
Equipment Installation
ISO 15042 7.5HP Air-Enthalpy Energy Difference Test system 2ISO 15042 7.5HP Air-Enthalpy Energy Difference Test system 3
Products
PRODUCTS DETAILS
ISO 15042 7.5HP Air-Enthalpy Energy Difference Test system
MOQ: 1
Price: Tailored
Standard Packaging: Plywood
Delivery Period: 2 Months
Payment Method: T/T
Supply Capacity: 1 Set Per Month
Detail Information
Place of Origin
China
Brand Name
Sinuo
Certification
Calibration Certificate (Cost Additional)
Model Number
SN331-25RT
Applied Standards:
ISO 15042, ISO 5151, Etc.
UUT Type:
7.5HP Air Conditioners
Test Report:
Format Can Be Customized
Cooling Capacity:
0.75 HP~7.5 HP
Heating Capacity:
0.75 HP~7.5 HP
Air Flow:
300~4000 M³/h
Static Pressure Precision:
≤±(±0.5%RD)+(±0.5%FS)
Nozzle Pressure Precision:
≤±(±0.25%RD)+(±0.25%FS)
Minimum Order Quantity:
1
Price:
Tailored
Packaging Details:
Plywood
Delivery Time:
2 Months
Payment Terms:
T/T
Supply Ability:
1 Set Per Month
Product Description
ISO 15042 7.5HP Air-Enthalpy Energy Difference Test System
System Overview
This 7.5HP air enthalpy method test laboratory consists of indoor and outdoor side rooms designed to test air conditioner performance by measuring temperature, pressure, and electrical parameters. The system is suitable for testing window type, split type, and free-standing air conditioners, supporting both standard operating condition tests and expanded testing requirements for product sampling inspection and development.
System operation is controlled via programmable controller and HMI interface, with high-accuracy data collection and real-time data transfer to upper-level computers for processing, display, storage, and report generation.
Compliance Standards
Designed and tested according to:
  • ISO 5151:2010
  • ISO 15042:2017
Operating Principle
The test room adjusts air dry bulb and wet bulb temperatures through balanced temperature and humidity control. The refrigeration system provides continuous cooling and dehumidification, while temperature control meters regulate heater and humidifier output to achieve desired air conditions.
ISO 15042 7.5HP Air-Enthalpy Energy Difference Test system 0
Operational Procedures
Pre-Startup Checklist
  • Review previous running records
  • Verify power and water supply status
  • Ensure unit under test (UUT) is properly installed
Standard Operation
  • Close power breaker and press "Start" button
  • Activate fans, heating, humidifying, and static pressure systems via HMI
  • Engage refrigeration and nozzle systems as required
  • Set temperature controller SV values according to operating conditions
  • Energize UUT via frequency variable power supply
  • Measure UUT parameters once operating conditions stabilize
  • Shutdown follows reverse sequence of startup procedure
Unit Under Test Specifications
Supported UUT Types
  • Wall type
  • Ceiling type
  • 4-way type
  • Floor stand type
Measurement Ranges
  • Testing Capacity Range:
    • Cooling Capacity: 0.75 HP - 7.5 HP
    • Heating Capacity: 0.75 HP - 7.5 HP
  • Air Flow: 300-4000 m³/h (7.5HP receiving chamber)
  • Unit Dimensions:
    • Panel Type: W≤1000mm, D≤800mm, H≤1800mm
    • Split Type: W≤1000mm, D≤500mm, H≤2000mm
  • Electrical Parameters:
    • Single phase power: 0-5kW
    • Single phase voltage: 0-300V
    • Single phase current: 0-20A
    • Frequency: 50/60Hz
    • Power factor: 0-1
Power Supply
  • Type: Three Phase, Four Wire, 45kVA (1 set)
  • Supply station: 7.5HP One-driven-one type (3-phase power supply)
Environmental Requirements
  • No strong air flow, direct sunlight, or corrosive gases
  • No intense vibration or interference sources
  • Ambient temperature: 0℃-35℃, relative humidity: <90%
  • Test control room environment:
    • Temperature: 23℃±5℃
    • Humidity: <85%RH (including non-operational periods)
    • Free from insects, rodents, and corrosive gases
Utility Requirements
  • Power supply: 3Φ5W 415V±10%, 50Hz, 150kVA (50%-85% operational rate)
  • Water supply: Clean, scale-free water at 20L/h; DN15 connection
  • Drainage: DN50 connection
Testing Capabilities
  • Rated cooling capacity (T1, T2, T3)
  • Rated heating capacity (High, Low, Extra-low)
  • Airflow measurement
  • Dehumidification capacity
  • Input power analysis
  • EER/COP calculation
  • Frequency, current, and voltage measurement
Measurement Accuracy
Measurement AccuracyRepeatability Accuracy
Compared with standard machineAverage deviation from 3 tests once installed
Cooling capacity: ±2%Cooling capacity: ±1%
Heating capacity: ±2%Heating capacity: ±1%
Major Test Conditions
NoTesting ItemIndoor Side (℃)Outdoor Side (℃)
Dry BulbWet BulbDry BulbWet Bulb
1Rating Cooling T127193524
Rating Cooling T221152719
Rating Cooling T329194624
2Maximum Cooling T132234832
Maximum Cooling T227193524
Maximum Cooling T332235231
3Freeze-up T121152115
Freeze-up T22115108
Freeze-up T321152115
4Minimum Cooling21151812
5Enclosure Sweat27242724
6Rating Heating High201576
Rating Heating Low201521
Rating Heating Extra Low108-5-6
7Maximum Heating27192418
8Minimum Heating2015-7-8
9Automatic Defrost201221
Additional Test Conditions
Indoor SideOutdoor Side
Temperature (℃)10-40-15-60
Relative Humidity (RH)35%-93%25%-93%
Control Precision (℃)±0.2 (WB)±0.2 (WB)
Testing Precision (℃)±0.1 (WB)±0.1 (WB)
Note: Temperature combinations should not significantly deviate from standards. Standard refrigeration/heating conditions maintain ±0.2℃ control precision; other conditions maintain ±0.3℃. Capacity testing available via single side enthalpy method. Performance not guaranteed during defrosting or unit stoppage.
Continuous Operation
Outdoor side room continuous operation capability:
  • ≥10 hours at DB=2.0℃, WB=1.0℃
  • ≥8 hours at DB=-7.0℃, WB=-8.0℃
Measurement Uncertainties
  • RTD temperature precision: ≤±0.1℃
  • Static pressure difference: ≤±(±0.5%RD)+(±0.5%FS)
  • Nozzle pressure difference: ≤±(±0.25%RD)+(±0.25%FS)
  • Inlet & Outlet difference: ≤±(±0.25%RD)+(±0.25%FS)
  • Electrical inputs: ≤±(±0.25%RD)+(±0.25%FS)
  • Thermocouple temperature: ≤±0.5℃
  • Refrigerant pressure: ≤±(±0.25%RD)+(±0.25%FS)
  • Relative humidity transmitter: ≤±3.0%RH
System Structure
ISO 15042 7.5HP Air-Enthalpy Energy Difference Test system 1
Equipment Installation
ISO 15042 7.5HP Air-Enthalpy Energy Difference Test system 2ISO 15042 7.5HP Air-Enthalpy Energy Difference Test system 3
Sitemap |  Privacy Policy | China Good Quality Electrical Appliance Testing Equipment Supplier. Copyright © 2019-2026 Sinuo Testing Equipment Co. , Limited . All Rights Reserved.