| MOQ: | 1 |
| Price: | Negotiable |
| Standard Packaging: | Standard Exporting Boxed |
| Delivery Period: | 15 Days |
| Payment Method: | L/C, T/T |
| Supply Capacity: | 60 Sets Per Month |
IEC 62368-1 Clause 5.2.2.2 Touch Current Measuring Circuit
Product information:
This test network conforms to the measuring network requirements of IEC 60990 figure 5 touch current and the measurement method of protective conductor current,
(Figure 5- Measuring network, touch current weighted for letgo-immobilization), it is required by IEC 62368-1:2018 clause 5.2.2.2, etc.
An electrical energy source class is determined from both the voltage and the current under normal operating conditions, abnormal operating conditions, and single fault conditions.
Preparation:
Before testing, you need to prepare instruments as follow:
Oscilloscope x1
One or ten times the voltage probe x1
Power supply x1 (the test voltage or frequency that can be adjusted or changed to the required voltage or frequency)
![]()
![]()
![]()
| MOQ: | 1 |
| Price: | Negotiable |
| Standard Packaging: | Standard Exporting Boxed |
| Delivery Period: | 15 Days |
| Payment Method: | L/C, T/T |
| Supply Capacity: | 60 Sets Per Month |
IEC 62368-1 Clause 5.2.2.2 Touch Current Measuring Circuit
Product information:
This test network conforms to the measuring network requirements of IEC 60990 figure 5 touch current and the measurement method of protective conductor current,
(Figure 5- Measuring network, touch current weighted for letgo-immobilization), it is required by IEC 62368-1:2018 clause 5.2.2.2, etc.
An electrical energy source class is determined from both the voltage and the current under normal operating conditions, abnormal operating conditions, and single fault conditions.
Preparation:
Before testing, you need to prepare instruments as follow:
Oscilloscope x1
One or ten times the voltage probe x1
Power supply x1 (the test voltage or frequency that can be adjusted or changed to the required voltage or frequency)
![]()
![]()
![]()