|
MOQ: | 1 |
Price: | Negotiable |
Standard Packaging: | Standard Exporting Plywood Case |
Delivery Period: | 30 Days |
Payment Method: | L/C, T/T |
Supply Capacity: | 10 Sets Per Month |
IEC 62368-1 Clause 5.4.3 CTI PTI Tracking Flammability Test Chamber PLC Control
Product Information:
The Tracking Flammability Test Chamber is designed and manufactured according to the standard requirements of IEC 62368-1:2018 clause 5.4.3, IEC 60335-1 clause 29.2, Annex N, IEC 60112, etc.
It is used for determination of the relative resistance to tracking performance that solid electrical insulating material under the action of an electric field, when the surface exposed to water containing impurities.
The working principle of the leakage tracking test (tracking index testing) is that the conducting liquid (0.1%NH 4 CL) of required volume in the required height (35mm) and required time (30s) drops with the voltage between the platinum electrodes (2mm × 5mm) on the surface of solid insulating material. Thus, the users evaluate the tracking resistance performance of solid insulating material surface under the combined influence of electric field and humid or contaminate medium. In a word, this device is used to measure the compare tracking index (CT1) and electrical resistance index (PT1).
Technical Parameters:
Applied Standard | IEC 62368-1 |
Clause | 5.4.3 |
Working voltage | AC 220V/50Hz,1KVA |
Control | PLC |
Display | 7-inch color touch screen |
Testing voltage | 0~600V adjustable,precision 1.5% |
Timing device | 9999X0.1S |
Electrode | Platinum electrode and brass electrode each for a pair |
Electrode dimension |
(5±0.1)×(2±0.1)×(≥12), 30°slant |
Electrode included angle and distance | 60°±5°, distance is (4±0.1㎜) |
Electrode pressure | 1.00N±0.05N(digital display is optional) |
The interval of dropping liquid | 30±5S, adjustable |
Dropping liquid height | 35±5mm |
Dropping liquid delay | 0.2S(solenoid valve opening time) |
Dropping liquid size | 45~50 drip/cm3 |
Time-delay circuit | 2±0.1S (in 0.5A or larger current) |
Short-circuit pressure drop | 8% MAX |
Short-circuit current | 1±0.1A 1% |
Wind speed | 0.2m/s |
Environmental requirement | 0~40℃, relative humidity≤80%, in the place of no obvious vibration and corrosive gas |
Equipment size & weight | 1100mm* 550mm* 1100mm, 180KGS |
|
MOQ: | 1 |
Price: | Negotiable |
Standard Packaging: | Standard Exporting Plywood Case |
Delivery Period: | 30 Days |
Payment Method: | L/C, T/T |
Supply Capacity: | 10 Sets Per Month |
IEC 62368-1 Clause 5.4.3 CTI PTI Tracking Flammability Test Chamber PLC Control
Product Information:
The Tracking Flammability Test Chamber is designed and manufactured according to the standard requirements of IEC 62368-1:2018 clause 5.4.3, IEC 60335-1 clause 29.2, Annex N, IEC 60112, etc.
It is used for determination of the relative resistance to tracking performance that solid electrical insulating material under the action of an electric field, when the surface exposed to water containing impurities.
The working principle of the leakage tracking test (tracking index testing) is that the conducting liquid (0.1%NH 4 CL) of required volume in the required height (35mm) and required time (30s) drops with the voltage between the platinum electrodes (2mm × 5mm) on the surface of solid insulating material. Thus, the users evaluate the tracking resistance performance of solid insulating material surface under the combined influence of electric field and humid or contaminate medium. In a word, this device is used to measure the compare tracking index (CT1) and electrical resistance index (PT1).
Technical Parameters:
Applied Standard | IEC 62368-1 |
Clause | 5.4.3 |
Working voltage | AC 220V/50Hz,1KVA |
Control | PLC |
Display | 7-inch color touch screen |
Testing voltage | 0~600V adjustable,precision 1.5% |
Timing device | 9999X0.1S |
Electrode | Platinum electrode and brass electrode each for a pair |
Electrode dimension |
(5±0.1)×(2±0.1)×(≥12), 30°slant |
Electrode included angle and distance | 60°±5°, distance is (4±0.1㎜) |
Electrode pressure | 1.00N±0.05N(digital display is optional) |
The interval of dropping liquid | 30±5S, adjustable |
Dropping liquid height | 35±5mm |
Dropping liquid delay | 0.2S(solenoid valve opening time) |
Dropping liquid size | 45~50 drip/cm3 |
Time-delay circuit | 2±0.1S (in 0.5A or larger current) |
Short-circuit pressure drop | 8% MAX |
Short-circuit current | 1±0.1A 1% |
Wind speed | 0.2m/s |
Environmental requirement | 0~40℃, relative humidity≤80%, in the place of no obvious vibration and corrosive gas |
Equipment size & weight | 1100mm* 550mm* 1100mm, 180KGS |