Send Message
Home ProductsFlammability Test Chamber

IEC 60112 CTI PTI Tracking Flammability Test Chamber PLC Control

Certification
China Sinuo Testing Equipment Co. , Limited certification
China Sinuo Testing Equipment Co. , Limited certification
Customer Reviews
Perfect on-site installation service, excellent training and technology support. Absolutely helps us a lot.

—— Aryan Das

Thanks. Your company is very professional, I am sure we will have good cooperation in the future.

—— Fernando Fuentealba

It's a great purchase, good products received with good packing, will back to you for next needs.

—— Sarah Rashad

I'm Online Chat Now

IEC 60112 CTI PTI Tracking Flammability Test Chamber PLC Control

IEC 60112 CTI PTI Tracking Flammability Test Chamber PLC Control
IEC 60112 CTI PTI Tracking Flammability Test Chamber PLC Control IEC 60112 CTI PTI Tracking Flammability Test Chamber PLC Control IEC 60112 CTI PTI Tracking Flammability Test Chamber PLC Control IEC 60112 CTI PTI Tracking Flammability Test Chamber PLC Control

Large Image :  IEC 60112 CTI PTI Tracking Flammability Test Chamber PLC Control

Product Details:
Place of Origin: China
Brand Name: Sinuo
Certification: Calibration Certificate (Cost Additional)
Model Number: SN774
Payment & Shipping Terms:
Minimum Order Quantity: 1
Price: Negotiable
Packaging Details: Plywood
Delivery Time: 30 Days
Payment Terms: T/T, L/C, Western Union, MoneyGram
Supply Ability: 10 Sets Per Month
Detailed Product Description
Applied Standard: IEC 60112 Control: Integrated PLC
Display: 7" Touch Screen Test Voltage: 0~600V Adjustable
Electrode Material: Platinum Electrodes And Brass Electrodes Electrode Pressure: 1.00N±0.05N
Dropping Liquid Height: 35±5mm Dropping Liquid Volume: 45~50 Drip/cm3
High Light:

IEC 60112 Flammability Test Chamber

,

PLC Flammability Test Chamber

,

ASTMD3638 Flammability Test Apparatus

 

IEC 60112 Leakage Tracking Test Apparatus

 

Product overview:

The leakage tracking test equipment is designed and manufactured according to the standard requirements of IEC60112, it is required by IEC60335-1 clause 29.2 and Annex N, IEC 60065:2014 clause 13.4, IEC60598-1, IEC 60884-1, UL746A and ASTM D3638-92 and etc. It is used for determination of the relative resistance to tracking performance that solid electrical insulating material under the action of an electric field, when the surface exposed to water containing impurities.

 

The leakage tracking tester adopts to advanced PLC control system and humanized 7” color touch screen, the dripping is controlled by a high-precision micro water supply pump, the timing is automatic, the electrode pressure sensor is accurate, and the operation is simple, accuracy is high, it is leading among similar equipment.

 

Technical parameters:

 

Parameter model SN774 (0.5m³)
Working voltage Match client's local power supply requirements
Control Advanced PLC
Display 7 inch color touch screen
Testing voltage 0~600V adjustable, precision 1.5%
Timing device 9999X0.1S
Electrode Platinum electrodes and brass electrodes, each of a pair
Electrode dimension

(5±0.1)×(2±0.1)×(≥12),

30°slant

Electrode included angle and distance 60°±5°, distance is (4±0.1) mm
Electrode pressure 1.00N±0.05N
The interval of dropping liquid 30±5S, adjustable
Dropping liquid height 35±5mm
Dropping liquid delay 0.2S(solenoid valve opening time)
Dropping liquid volume 45~50 drip/cm3
Time-delay circuit 2±0.1S (in 0.5A or larger current)
Short-circuit pressure drop 8% MAX
Short-circuit current

1±0.1A

Accuracy: 1%

Wind speed 0.2m/s
Environmental requirement 0~40℃, relative humidity≤80%, in the place of no obvious vibration and corrosive gas
Equipment size & weight 1100mm* 620mm* 1450mm, 180KGS
conforms to standard IEC60695, IEC60112, IEC 60598-1, IEC 60884-1, UL746A, ASTMD3638, etc.
 

 

IEC 60112 CTI PTI Tracking Flammability Test Chamber PLC Control 0

 

Contact Details
Sinuo Testing Equipment Co. , Limited

Contact Person: Ms. Zoe Zou

Tel: +86 13527656435

Fax: 86-020-39185976

Send your inquiry directly to us (0 / 3000)